Reganosa gets ready for the change of LNG bunkering supply at El Ferrol

2020 will be the culminating moment for the beginning of the operations of liquefied natural gas bunkering on a small scale, which are already done occasionally at present and, for this, the terminal of Reganosa that operates in Ferrol is setting up new infrastructures and procedures that are developed under the European project CORE LNGAS hive.
In the event that the fishing fleet and regional ownership were passed to this supply, it would mean a saving of up to EUR 21.2 million.

Table of Contents
Related posts

From 1 May 2025, ships operating in the entire Mediterranean Sea will be required to burn fuel oil with a

Naturgy and the Norwegian Equinor have gone a step further in their alliance in offshore wind power with the signing

Depósitos Portuarios, SA (Deposa) terminal has completed the construction of six new agri-food and agro-energy liquid bulk storage tanks in